Modular Data Center Solutions

Prefabricated, containerized capacity that deploys faster than a traditional build, delivered as a complete solution rather than a box on a pad.

Overview

Modular Data Center Solutions

Modular data centers have become a practical way to add capacity quickly and predictably. Hyperscale providers, enterprises, government agencies and educational institutions use them to grow in step with demand instead of building years ahead of it.

The module itself is only part of the answer. SESG brings together design coordination, site installation, power integration, commissioning and testing, so the finished deployment is tailored to your requirements and handed over ready to carry load.

See everything SESG delivers across data center, telecom and utility work.

Features & capabilities

What we deliver.

Baseline designs are customized to the environment, performance and application, whether the need is growth capacity, recovering stranded space or power, or a specialized deployment.

Complete capacity delivery

  • Design and engineering
  • Procurement
  • Fabrication coordination
  • Delivery and installation
  • Commissioning, startup and handoff

Customized to your site

  • Requirements set with your design and engineering team
  • Site conditions: elevation, geography, temperature
  • Cooling approach
  • Equipment and OEM preferences

Configurations

  • Stand-alone white space
  • Critical power modules
  • White space with critical power
  • Integrated mechanical solutions
  • Full turnkey with integrated IT

Use cases

  • Capacity expansion
  • Edge deployments
  • SCIF deployments
  • Stranded power or space recovery
  • Temporary capacity

How we run it

A process you can audit.

Four steps, the same on every project, documented as they happen.

  1. Define

    Capacity, density, site constraints and schedule set the basis of design.

  2. Coordinate

    Manufacturer, engineering and site teams are aligned on deliverables and dates.

  3. Install

    Modules are set, connected and integrated with site power and cooling.

  4. Prove

    Commissioning confirms the deployment performs as designed before handover.

Benefits

Why it matters.

Flexible, customizable capacity that can be delivered faster and at lower cost than traditional construction.

Customizable

Adapted to the requirements of each use case and site.

Reliable

Modules are designed, built and tested before delivery, which reduces complexity and risk on site.

Cost effective

Typically less expensive than traditional construction, and modules can be redeployed.

Scalable

Capacity added in step with demand.