Bismarck and Mandan
Enterprise, government and new large-load sites around the capital.
- Commissioning for new capacity
- Maintenance contracts
- MDU coordination

North Dakota service area
From Bismarck and Mandan to Fargo, Grand Forks, Ellendale and the Williston Basin, SESG commissions data centers built for North Dakota winters and keeps them maintained and supported all year.
Cold climate
Our services in North Dakota
Level 1 to Level 5 commissioning for high-density and hyperscale campuses, with cold-weather scenarios built into the test plan.
Maintenance plans that get generators, fuel and freeze protection ready before winter and keep power and cooling healthy all year.
Maintenance Service Contracts Electrical Services Battery Services
A 24/7 emergency line, field crews for remote builds and on-site staff for daily operations.
24/7 Emergency Services Mission-Critical Project Support Facility Staffing
Deliverables
When the nearest metro is hours away, the records have to be complete the first time.
Where we work in North Dakota
Enterprise, government and new large-load sites around the capital.
Enterprise and colocation data centers in the Red River Valley.
New high-density campuses and remote sites, including the Williston Basin.
Preventive maintenance
Intervals follow the manufacturer, NFPA 70B and NFPA 110, with a full readiness check before the first hard freeze.
| System | What we check and service | Why it matters in North Dakota |
|---|---|---|
| Generators | Block heaters, batteries, chargers, monthly runs, load bank tests | A cold start has to work the first time |
| Fuel systems | Fuel quality, winter additives, tank heaters, heat tracing | Gelled diesel stops a generator |
| Cooling and economizers | Dampers, low-temperature controls, freeze protection | Outside air can freeze coils |
| UPS and batteries | Electrical checks, impedance readings, room temperature | Cold rooms reduce battery capacity |
| Switchgear | Infrared scans, torque checks, breaker testing | Heavy winter loads stress connections |
How we run remote projects
Many North Dakota sites are hours from the nearest metro. This is how we keep them on schedule.
Crews, test equipment and load banks travel to the site and stay through each phase.
L1 to L5 commissioning, including cold-weather modes and generator cold starts.
A full turnover package, then a maintenance plan with defined response.
Project support
Remote campuses need people on site for the whole phase. Our mission-critical project support is built for that.
Halls brought online one at a time, with go-live support for each.
The whole site delivered on a demanding schedule.
Service coverage
We do not limit work to the big metros. Every one of North Dakota's 372 cities and towns is in our service area.
Major cities
FAQ
Yes. We commission data centers in Bismarck, Mandan, Fargo, Grand Forks, Ellendale and across North Dakota.
Yes. Cold-weather starts, block heaters, fuel and freeze protection are part of functional testing and of the maintenance plan.
Yes. Our crews travel to remote sites and stay through each phase, with test equipment and load banks brought in.
Yes. We build annual and multi-year plans, with a full readiness check before winter and 24/7 emergency support.
Mission-critical services
One team for the whole life of a mission-critical facility: our L1 to L5 commissioning program for new capacity, data center maintenance services for what is running, and round-the-clock emergency support when something fails.
Start a project
Tell us the site, the load and the energization date. We will tell you how we would commission it for winter and support it afterwards.