Data center services
MV/LV Electrical Infrastructure
Medium- and low-voltage distribution built and integrated for data centers, from the switchgear lineup to the white space, and handed to commissioning ready to test.
Overview
MV/LV Electrical Infrastructure
The electrical path is the part of a data center nobody can afford to rework after energization. SESG delivers MV/LV fit-outs with commissioning in mind from the first termination: installed to the submittal, inspected as the work proceeds, and documented so installation verification and startup move without surprises.
As a mid-sized organization, we bring the responsiveness of a specialized firm and the capability to execute complex fit-outs under demanding schedules.
See everything SESG delivers across data center, telecom and utility work.
In scope
- Medium-voltage switchgear
- Transformers
- Low-voltage switchboards and distribution
- UPS systems integration
- Busduct and busway
- Cable tray and feeders
- RPP and PDU integration
- White space electrical fit-outs
How we run it
A process you can audit.
Four steps, the same on every project, documented as they happen.
- Review and plan
Drawings, submittals and the energization schedule reviewed together, so the installation sequence supports the commissioning plan.
- Install and integrate
Switchgear, transformers, distribution and busduct installed and integrated to the approved design.
- Inspect as built
QA/QC inspections recorded during installation, not reconstructed at the end.
- Release to commissioning
Equipment handed to installation verification with its documentation complete.
Deliverables
What you receive.
- As-built documentationWhat was installed, where, and to which revision.
- Installation QA/QC recordsInspections captured at each hold point.
- Punch list closeoutEvery item tracked to resolution.
- OEM compliance recordsInstallation checked against manufacturer requirements.